OERM Signal Class Notes - August 23, 2003




The following items were discussed at the Signal Class on August 23, 2003:

A review of last months discussions on crossing circuits: Central Xing -- narrow gauge line back of museum - Single WigWag with motion detector and AFTAC audio overlay

Alpine Xing -- main line at museum entrance -- Dual WigWags with track circuit control

11th St Xing -- public crossing in Perris -- initial discussions only


Relay Contacts: Normal = NO TRAINS

Front = Closed when energized (UP)

Back = Closed when de-energized (DOWN)


NOTES: NEVER violate minimum FRA/AAR Standards but we can always make it "safer".

20 Seconds - minimum crossing protection prior to train
25 Seconds - usual design time for crossing protection prior to train








Return to OERM Signals homepage
09/02/2003