OERM Signal Project Notes - July 26, 2003


The following items were repaired, installed, or maintained by the "class crew" on July 26, 2003:

     Signal Garden

Work on the signal garden this weekend consisted of coordination and planning with Barry Todd designer and programmer of the microcontroller. The long term build out and needed programming changes were discussed. Future plans call for the following: August 24 (Sunday) - plan overall design, September - program changes, October - rewire controller and cabinet.
     Alpine Wig-Wag/Motor Switch

Replacement of cable to the East side WigWag is needed -- this will require installing cable under the main track. The Hirth's plan is to install this new cable on a Friday when trains should not be running. The work date is TBD.
     Alpine-Middleton Cable Replacement

Discussions continued -- it is still hoped that late this summer the cable will be replaced. The ladder needed to work on each pole was purchased this weekend. Next Mike will purchase the "V" bracket with Hooks (probably from Graybar) which will attach to the top of the ladder and allow it to safely rest on a pole or hang on the messenger cable. The latest plan is to add an additional new messenger cable for the new signal cable and leave the old messenger in place. Cable is available but it is not long enough to complete the entire run in one segment. A splice box will probably be installed in the middle of the run -- this box will be down near ground level to allow easy maintenance (one of the problems with the existing cables splice boxes which are high up the poles).
     11th St Xing Tie Shoring

On Sunday July 27, Gary and Allen measured the needed ties at 11th St Xing (North track circuit), found available ties, cut them to length and drilled "spike" holes in the short lengths but ran out of time to complete the holes in the long one. This should be completed on Saturday August 23.
     Signal Document Organizing and Filing

During the following week, Allen began the big task of organizing, cataloging, and filing all of the documents in the Signal Shop. He made great progress and created a good list of the sorted documents - this list is just draft at this point. After final cataloging, a full list will be posted in the Museum drawings and documents section of this web site.
      

 